CDW, St Paul’s, London

We worked with MJF Office on CDW’s new head office in One New Change, overlooking St Paul’s Cathedral. With over 20 meeting rooms and cellular offices requiring acoustic treatment to control reverberation, ReSorb Walls, Panels and Baffles were specified.

Using Camira Blazer to fabricate the walls and panels gives a consistent look throughout the offices, suiting in with all the new furniture. The result was a stylish and colourful design with all the rooms functioning well acoustically.

Case study to follow.